The work comprised the conversion of a grade II listed banking hall, previously occupied by Barclays Bank, into the Norwich Youth Venue to be known as 'Open'.
View case studyJohn Youngs began working on the new 510 square-metre, two-storey boathouse in October 2010 with the installation of pile-driven concrete foundations.
View case studyWorks began in July 2010 and consisted of upgrading outdated rooms to create a modern working environment for social sciences faculty staff at the University of East Anglia in Norwich.
View case studyWe originally built Greenfields Care Home in Hales 20 years ago. Due to a change of owners and higher specifications for residential care, John Youngs revisited Greenfields in July 2010.
View case studyJohn Youngs began construction on Hopton Village Hall in January 2010, replacing a hall that dated back decades and reflected the building vogue of those years - from asbestos to Crittall metal windows.
View case studyWe began work on the 20 x 12-metre single-storey extension to the Norfolk and Norwich University Hospital's angiography suite in January 2010.
View case studyJohn Youngs began repair and extension works at Caistor St Edmund Church in Caistor St Edmund in September 2010.
View case studyJohn Youngs began work on this listed Boulton and Paul Conservatory in August 2009. The conservatory measures some 20 metres by 8 metres and is part of Carrow House in Norwich, itself a listed building on which John Youngs has carried out a previous refurbishment.
View case studyThe environmental improvement works comprised the re-roofing of 1,200 square-metre Carrow House, a Victorian mansion in central Norwich. The building currently houses the Costume and Textile Study Centre but was previously the home of the Colman family.
View case studyIn September 2009 John Youngs undertook works to repair the fire escape of this Norwich film studio located in Magdalen Street (part of the Norwich University College of the Arts).
View case studyJohn Youngs started work on the new 350 square-metre pavilion at the New Road, Belton, Great Yarmouth site in March 2009.
View case studyWorks involved construction of a 70 square-metre extension to a medical practice that has been in existence on its present site since the 1940's. The Mile End Building was acquired by The Castle Partnership in 1976 and is one of the Norwich practice's three surgeries.
View case studyJohn Youngs began works in March 2010 on a 12-week refurbishment of the ground and first floors of the four-storey premises in Norwich which stands on the corner of two leading throughfares, Upper King Street and Prince of Wales Road.
View case studyRefurbishment works to transform an office block from the sixties into more modern accommodation began in July 2009.
View case studyJohn Youngs began work on re-roofing the 15th Century All Saints Church at Thurlton, south Norfolk, in April 2010.
View case studyJohn Youngs finished working on the construction of a children's community centre located on the premises of Stalham First School in March 2009.
View case studyJohn Youngs began work on the new eco village hall for Neatishead, on the Norfolk Broads, in February 2009.
View case studyJohn Youngs began work on the Narthex at St John's Roman Catholic Cathedral, Norwich, in February 2009. The grade I listed cathedral is considered to be the most complete example of neo-gothic ecclesiastical architecture in the country and has been designated as one of the city's 12 most important buildings
View case studyJohn Youngs began works on a new extension of this busy Norfolk GP's surgery in June 2009. Works involved the construction of a new dispensary and waiting area at the Blofield surgery, enhancing the services offered to patients, while offices and a meeting room have ensured the growing practice runs smoothly.
View case studyJohn Youngs commenced work on a new CT Scanner Room for The Norfolk and Norwich University Hospital in September 2009 and works were completed by the end of November. The creation of this room enabled the hospital to acquire a third CT scanner so more patients can be treated each day.
View case studyRefurbishment and roof repairs to St Peter's and St Paul's Church, Griston, were undertaken by John Youngs in April 2009.
View case studyJohn Youngs started work in late September 2008 for the Norfolk and Norwich Association for the Blind (NNAB) on an activity centre designed especially for people with sight problems.
View case studyJohn Youngs began work on the landmark St George's building at Norwich University College of the Arts during the summer of 2009 to create a new entrance adjacent to the existing entrance.
View case studyThe project comprised the conservation, alterations and restoration of a derelict fish-curing works to create one of the biggest maritime museums of its kind in the country.
View case studyThe works comprised the gutting of a former English pub known as Scores, set within Norwich City Football Club, and transforming it in to a New York-style diner named 'Yellows' in just 10 weeks.
View case studyThe works comprised of demolition of the existing car park and traditional construction of a Day Nursery at Norfolk and Norwich University Hospital.
View case studyThis project involved John Youngs creating a new kitchen at a top city centre Italian restaurant, Trattoria Rustica. The location of this 16th Century grade II listed building in Princes Street in the centre of Norwich, meant that the team had to operate within the confines of a courtyard.
View case studyWork was carried out on a new print facility for education client Cambridge Assessment and comprised the design and construction of a mezzanine floor within an existing warehouse in order to form a print facility within the premises. The warehouse remained operational throughout.
View case studyThe works comprised a two-storey addition to the existing Job Centre in Great Yarmouth. The finished extension blends with the existing building, and its construction of semi-engineering brick and blockwork complies with the Government regulations for buildings to be blast proof.
View case studyJohn Youngs undertook works on the Job Centre Plus (JCP), Townsend House, Thetford, to help staff cope with their increasing workload. This involved expanding into empty premises next door which involved two phases of work, as the building had to remain operational throughout.
View case studyThe works included the design and construction of a new Medical Centre on Wessex Street in Norwich.
View case studyJohn Youngs began work on a new Eco-Mass boiler for the cathedral after completing 'The Narthex' project in January 2010 as the cathedral decided to adopt a new-age approach to its use of natural resources.
View case studyJohn Youngs started work in May 2006 after completing enabling works on the former Bussey's garage site located on Palace Street, a site which nestles in the shadow of Norwich Cathedral. An eight-week archaeological dig uncovered new information about Norwich's medieval past and revealed hundreds of fragments, and traces of ancient cellars.
View case studyJohn Youngs undertook works to construct a new classroom of the future and biosphere for Notre Dame High School in Norwich in March 2007.
View case studyThe scheme comprised an extension and extensive alterations to Gillingham St Michaels First School, near Beccles. The new building has created more classroom space as well as a library and welfare facilities.